My EIT Journal

A documentation of the work I do as an Engineer-in-Training.

Blog Archive

  • ►  2007 (1)
    • ►  January (1)
  • ▼  2006 (21)
    • ►  July (10)
    • ▼  June (11)
      • Day 10Today, I spent only 3 hours working on cable...
      • Day 9More cable work. I met with Jeff to go over ...
      • Day 8Once again, more cable lengths were worked on...
      • Day 6The entire day was spent working on cable len...
      • Day 5The entire day was spent working on cable len...
      • Day 4I started reviewing AutoCAD using online turo...
      • Day 3Today I continued on with more cable length m...
      • Day 2In the morning, I spent an hour working with ...
      • Day 1My first day as an EIT with GP. After taking ...
      • Arc Flash ReviewI spent between 5 and 6 hours over...
      • My name is Gary Wicentowich.I am a registered Engi...

About Me

Gary
View my complete profile

Monday, June 26, 2006

Day 6
  • The entire day was spent working on cable lengths for various (4) Enbridge stations. 8 hours
Posted by Gary at 5:04 PM
Newer Post Older Post Home